Western Carolina Waste Water Treatment Facility
Merit Award from AIA SC Chapter
LEED Silver Certification, 2010
Burdette Engineering, Inc. provided electrical design for the facility to facilitate a modern, technologically current building with exposed ceilings and tall central core and patio. Electrical design included backup power for critical operations and rerouting fiber feeds from sewer plant across Mauldin Road. Burdette performed design modifications to the optical fiber service in the facility, which included extensive revisions of the following design elements: fiber configuration, fiber routing, fiber testing procedures, proposed pathways that include underground handholes and ductbanks. Services also included bidding and construction observation and administration.