MRI Suite RenovationSeneca, SC

PRISMA Health – Oconee Memorial Hospital
Renovation

Burdette is designing the electrical design for the renovation of approximately 3,180 square feet of shell space for a new MRI Suite and equipment at Prisma Health Oconee Memorial Hospital in Seneca, SC.  Scope includes modifications to existing electrical power for new equipment, new lighting design for equipment room, treatment room and support areas, fire alarm design modifications and HVAC modifications as required.

Emergency Department RenovationSumter, SC

PRISMA Health – Midlands
Renovation & Addition

Burdette Engineering Inc. provided electrical design services to support renovation and expansion of existing Emergency Department. Efforts include renovation of approximately 7,500 square feet and new addition of 13,000 square feet.

Gateway House ClubhouseGreenville, SC

New Construction

This new 22,448 square foot multipurpose clubhouse with two commercial kitchens, snack bar, dining areas, meeting spaces and offices, etc., is ready and open to serve approximately 450 adults.  Since the 1980s, Gateway House has offered adults with mental illness a chance to live and work independently, building confidence with education and hands on training.

PRISMA Medical Office BuildingSeneca, SC

New Construction
Burdette Engineering, Inc. provided the electrical engineering for a new 14,220SF building for Prisma Health’s residency program. The program will accommodate three physicians, 18 medical residents and a support staff of nurses, social workers and administrative personnel. Services included were: Electrical service entrance design, Electrical lighting and lighting controls to meet current energy codes, Convenience power throughout building, HVAC connections for all new equipment, Fire Alarm System design and Emergency lighting as needed.

Parkside Pediatrics – VerdaeGreenville, SC

New Facility

Beautiful new pediatric care office for Parkside Pediatrics Group.  Scope of design included lighting, power, fire alarm and electrical service for one of four new medical buildings on Verdae Boulevard in Greenville, SC.  Site lighting was also provided as standard single head fixtures on poles with controls included.

 

New Horizon Family Health ServicesGreenville, SC

New Facility

This new 64,000SF building is designed to house three floors of family, pediatric and adult general practice exam rooms, a main floor of triage, X-Ray and procedure/treatment rooms as well as executive and administrative offices for the service group’s other campuses located in the Upstate. The facility is  located between the Greenville Hospital System’s flagship Memorial Campus and the new Veteran’s Administration Medical Office Facility on Grove Road.  Burdette’s design services include lighting and power design, fire alarm and emergency power, data and communications, lightning protection, equipment power design and site lighting.

OR Equipment ReplacementGreer, SC

Greenville Health System

In order to complete the renovations to Operating Room Number 3 of the Greer Campus of Greenville Health System, Burdette designed the electrical needs to include replacement of the Cysto Radiological Equipment.  Services provided include upgrade of electrical circuit, feeder and controls as well as coordination with SCDHEC.  

MRI Suite RenovationGreenville, SC

Greenville Health System

8,300 SF MRI addition and renovation to an existing GI suite. Lighting, power, fire alarm system design. Emergency power provided from existing distribution system. Raceways provided for nurse call and voice/data systems. Project is designed to meet SCDHEC regulations, JCAHO requirements.

Medical Office Building No. 2Sumter, SC

Tuomey Healthcare

A 100,000 SF, three-story plus penthouse medical office building with build-out of first floor to include Ambulatory Surgical Center with emergency power distribution (life safety, critical and equipment branches), lighting, power and communication design.

Internal Medicine AssociatesGreenville, SC

  • IMA - Burdette Engineering, Greenville South Carolina

New Facility

New Construction of 80,000 SF, three story shell building with subsequent build-out power and lighting design.  Upfit spaces included X-Ray, CT equipment, exam rooms, ASHRAE 90.1, 2004 compliant.

MD360 Medical BuildingGreer, SC

New Facility

A new, 12,000 SF standalone medical office building to contain housing, physical therapy, X-Ray, general practice and support office spaces.  Electrical design of site lighting for parking area to include specialty landscape and building lighting with integrated controls.

Hybrid Operating Room RenovationGreenville, SC

Greenville Health System

Renovation of existing 2nd Floor space at Greenville Memorial Hospital into Hybrid OR Suite.  Hybrid OR to be approximately 1,100 SF, with Control Room, Equipment Room, Sterile Work and Storage, as well as Scrub Area.