Pharmacy and Bio-RepositoryGreenville, SC

Greenville Health System
Renovations
IN PROGRESS

Renovation of existing space on the third floor of the ITOR Building to provide new consolidated compounding pharmacies to serve all GHS facilities as well as bio-repository at Greenville Memorial Hospital.  Electrical design services include lighting, power, emergency power, fire alarm, power for specialized equipment, and data and communication conduit.

 

Parkside Pediatrics – VerdaeGreenville, SC

New Facility

Beautiful new pediatric care office for Parkside Pediatrics Group.  Scope of design included lighting, power, fire alarm and electrical service for one of four new medical buildings on Verdae Boulevard in Greenville, SC.  Site lighting was also provided as standard single head fixtures on poles with controls included.

 

New Horizon Family Health ServicesGreenville, SC

New Facility

This new 64,000SF building is designed to house three floors of family, pediatric and adult general practice exam rooms, a main floor of triage, X-Ray and procedure/treatment rooms as well as executive and administrative offices for the service group’s other campuses located in the Upstate. The facility is  located between the Greenville Hospital System’s flagship Memorial Campus and the new Veteran’s Administration Medical Office Facility on Grove Road.  Burdette’s design services include lighting and power design, fire alarm and emergency power, data and communications, lightning protection, equipment power design and site lighting.

OR Equipment ReplacementGreer, SC

Greenville Health System

In order to complete the renovations to Operating Room Number 3 of the Greer Campus of Greenville Health System, Burdette designed the electrical needs to include replacement of the Cysto Radiological Equipment.  Services provided include upgrade of electrical circuit, feeder and controls as well as coordination with SCDHEC.  

MRI Suite RenovationGreenville, SC

Greenville Health System

8,300 SF MRI addition and renovation to an existing GI suite. Lighting, power, fire alarm system design. Emergency power provided from existing distribution system. Raceways provided for nurse call and voice/data systems. Project is designed to meet SCDHEC regulations, JCAHO requirements.

Medical Office Building No. 2Sumter, SC

Tuomey Healthcare

A 100,000 SF, three-story plus penthouse medical office building with build-out of first floor to include Ambulatory Surgical Center with emergency power distribution (life safety, critical and equipment branches), lighting, power and communication design.

Internal Medicine AssociatesGreenville, SC

  • IMA - Burdette Engineering, Greenville South Carolina

New Facility

New Construction of 80,000 SF, three story shell building with subsequent build-out power and lighting design.  Upfit spaces included X-Ray, CT equipment, exam rooms, ASHRAE 90.1, 2004 compliant.

MD360 Medical BuildingGreer, SC

New Facility

A new, 12,000 SF standalone medical office building to contain housing, physical therapy, X-Ray, general practice and support office spaces.  Electrical design of site lighting for parking area to include specialty landscape and building lighting with integrated controls.

Hybrid Operating Room RenovationGreenville, SC

Greenville Health System

Renovation of existing 2nd Floor space at Greenville Memorial Hospital into Hybrid OR Suite.  Hybrid OR to be approximately 1,100 SF, with Control Room, Equipment Room, Sterile Work and Storage, as well as Scrub Area.

Cancer Center of the CarolinasSpartanburg, SC

LINAC Addition

A 9,000 SF addition to the existing medical office building for the expansion of the facilities radiological department.  Areas for linear accelerator, CT procedure and general X-Ray were added with complete electrical design for equipment.

Rolling Green VillageGreenville, SC

Assisted Living
Renovation

Renovation of both skilled nursing area to provide seven (7) new patient beds and renovation of the existing assisted living area to completely remove 1980’s construction and update all rooms, core areas, kitchen, dining areas, gathering areas.  Upgraded fire alarm system, lighting systems, expanded generator systems to pick up SCDHEC required heating in the new patient rooms and for egress lighting.  Upfit existing unfinished shell space for new therapy, therapy pool, fitness and exercise rooms for use by residents.

Tuomey Hospital System Parking GarageSumter, SC

439 Spaces, 6 levels

New hospital parking garage that included electrical design service for service entrance, panel distribution for elevators, exhaust, HVAC, lighting for deck, fire alarm system to be connected to medical office building No. 2 for reporting, and a telephone system raceway.