New Construction
Inland Port Facility
Burdette Engineering, Inc. provided full electrical design services for the Inland Port Greer expansion in Greer, SC. Work included power distribution, utility coordination, generator systems, and lighting for the new 5,600 sq. ft. Terminal Operations Building, 3,900 sq. ft. Heavy Lifting Maintenance Building, and the expanded North Chassis Lot. These upgrades support a $55 million expansion that increases container yard capacity by 50%, and adds 9,000 feet of rail, enabling the port to handle 300,000 rail lifts annually and meet demand through 2040.